Report

Inventory structure and main feature and datasets (Deliverable 3.1)

The Horizon 2020 (H2020) BuiltHub project aims to analyze the Building Stock Observatory (BSO) by providing feedback and a possible list of relevant indicators, in addition to developing a community of data providers and users. Collectively, this will allow for a continuous flow of relevant and complete data. Details about these processes and the project are addressed in this report.

Publication Date: 31 Jan 2022

Author: A. Zambito, S. Pezzutto, U. Filippi Oberegger, R. Lollini, I. Jankovic

Report

Inventory structure and main feature and datasets (Deliverable 3.1)

Publication Date: 01 Feb 2022

Author: Andrea Zambito (EURAC), Simon Pezzutto (EURAC), Ulrich Filippi Oberegger (EURAC), Roberto Lollini (EURAC), Ivan Jankovic (BPIE)

See the whole resource

Inventory structure and main feature and datasets (Deliverable 3.1)

Report

Stakeholder needs and technical requirements for BuiltHub (Deliverable 2.2)

Stakeholder needs and technical requirements for BuiltHub: A synthesis from EU policy, survey, and interviews

Publication Date: 01 Mar 2022

Author: S. Zuhaib (BPIE), J. Kockat (BPIE), I. Jankovic (BPIE)

See the whole resource

Stakeholder needs and technical requirements for BuiltHub (Deliverable 2.2)